97人人在线视频,欧美一区二区三区日韩,国产韩日精品 http://www.hbysgp.com The Leading Supplier of China Amine Catalysts Thu, 04 Aug 2022 08:40:42 +0000 zh-CN hourly 1 https://wordpress.org/?v=6.1.7 http://www.hbysgp.com/wp-content/uploads/2023/12/1.jpg 000-ton PDO project – Amine Catalysts http://www.hbysgp.com 32 32 At a cost of 1.576 billion, Juhua will build a 150,000-ton PTT and 72,000-ton PDO project http://www.hbysgp.com/archives/39672 Thu, 04 Aug 2022 08:40:42 +0000 http://www.hbysgp.com/archives/39672 Latest News: On July 29, 2022, the Board of Directors of Zhejiang Juhua Co., Ltd. issued the “Announcement on Fixed Asset Investment Projects of Zhejiang Juhua Co., Ltd.”. The announcement disclosed that the company plans to build 15
10,000 tons/year special polyester chip new material project.

Project Overview

Project name: 150,000 tons/year special polyester chip new material project

Project subject: Ningbo Juhua Chemical Technology Co., Ltd. (a wholly-owned subsidiary of Zhejiang Juhua Co., Ltd.)

General layout: The total land area of ??this project is about 50 mu. The device is planned to be built in the open space of the South Plant of Ninghua Company, and no new land needs to be acquired.

Project investment: The total investment of this project is 1,576,230,700 yuan, of which: construction investment is 1,476,607,100 yuan, and the construction period interest is 5,763.38 yuan
10,000 yuan, with a working capital of 41.9869 million yuan.

Project content: This project plans to introduce international mature technology to produce 1,3-propanediol (PDO) with ethylene oxide as raw material.
Then, using purified terephthalic acid (PTA) and PDO as raw materials, through esterification and polycondensation reaction, PTT (polytrimethylene terephthalate) is formed.
The implementation of this project includes the main plant of 72,000 tons/year PDO and 150,000 tons/year PTT and its supporting projects.

Product plan: 150,000 tons/year PTT; 72,000 tons/year PDO (including: commodity volume 10,500 tons/year, intermediate products 61,500 tons/year).

Estimated economic benefits: It is estimated that after the normal operation of the project, the average annual sales income will be 2,130.91 million yuan, the average annual total profit will be 397.95 million yuan, and the average annual net profit will be 298.46 million yuan.

Project construction plan: The project is planned to be completed by the end of October 2024, and the test run will be completed by the end of 2024.

This project has been reviewed and approved at the 20th meeting of the eighth board of directors of the company, and does not need to be reviewed by the company’s general meeting of shareholders. As of the date of this announcement, the project has completed the government filing (project filing number [2202-330257-04-01-651782]) and the energy saving review approval (Yong Energy Approval [2022] No. 81).

]]>
主站蜘蛛池模板: 南投县| 四川省| 和林格尔县| 称多县| 博乐市| 惠州市| 昭通市| 吉林市| 廊坊市| 陆良县| 辉县市| 赤峰市| 宝鸡市| 福州市| 平谷区| 西昌市| 广德县| 彭州市| 福海县| 石狮市| 边坝县| 徐汇区| 邹平县| 黄龙县| 集安市| 扬州市| 江西省| 上思县| 泽库县| 航空| 晋城| 阳泉市| 望都县| 武山县| 肃宁县| 北流市| 乌海市| 三穗县| 樟树市| 伊金霍洛旗| 咸丰县|