亚洲电影一级片,电影91久久久,偷拍精品精品一区二区三区 http://www.hbysgp.com The Leading Supplier of China Amine Catalysts Thu, 30 Jun 2022 08:28:44 +0000 zh-CN hourly 1 https://wordpress.org/?v=6.1.7 http://www.hbysgp.com/wp-content/uploads/2023/12/1.jpg Shanxi determines the goal of increasing coal production and ensuring supply – Amine Catalysts http://www.hbysgp.com 32 32 Shanxi determines the goal of increasing coal production and ensuring supply, increasing production by more than 100 million tons this year http://www.hbysgp.com/archives/38870 Thu, 30 Jun 2022 08:28:44 +0000 http://www.hbysgp.com/archives/38870

Xinhua News Agency, Taiyuan, June 28 (Reporter Liang Xiaofei) The General Office of the Shanxi Provincial Government recently issued a notice stating that on the basis of safe production, coal production in Shanxi Province will increase by 107 million tons this year compared with 2021, reaching 1.3 billion tons Strive to increase production by another 50 million tons in 2023 compared with this year, reaching 1.35 billion tons in the whole year, giving full play to the role of coal as a bottom-line guarantee and strengthening energy supply.

While consolidating the foundation of existing coal mine production and speeding up the construction progress of coal mines, Shanxi will use market-oriented and legal methods to classify and dispose of 124 long-term suspended coal mines with a total construction scale of 124.3 million tons/year; Promote the resource allocation of 37 consecutive coal mine projects during the “14th Five-Year Plan” period; implement the scale adjustment policy for the 19 coal mines under construction that have been included in the national key supply guarantee list; accelerate the disposal of under-capacity coal mine capacity to make room for the increase in high-quality production capacity ; Speed ??up the procedures for the overall planning of 12 mining areas and the revision of the planning environmental impact assessment.

The notice requires that all departments at all levels should attach great importance to the safety production of coal mines, coordinately handle the relationship between safety production and increase production and ensure supply, ensure safe investment, further accelerate the intelligent construction and transformation of coal mines, and resolutely put an end to “super-capacity production” Instead of “increasing production and ensuring supply”, the situation of safe production in coal mines will continue to be stable.

Thanks to the supply-side structural reform, the production efficiency of Shanxi’s coal industry has improved significantly in recent years, and the proportion of advanced coal production capacity has exceeded 75%. In the first five months of this year, the output of raw coal above designated size in Shanxi reached 528 million tons, with an average monthly output of more than 100 million tons.

]]>
主站蜘蛛池模板: 分宜县| 明星| 峡江县| 光泽县| 双流县| 镇坪县| 克什克腾旗| 阿鲁科尔沁旗| 大悟县| 武隆县| 贡山| 江都市| 屏边| 衢州市| 泸水县| 丹东市| 齐齐哈尔市| 四子王旗| 温泉县| 都匀市| 武强县| 鲜城| 江陵县| 柏乡县| 阿合奇县| 长顺县| 玛曲县| 乌拉特后旗| 井冈山市| 潮安县| 新营市| 四子王旗| 沙湾县| 留坝县| 通城县| 漳浦县| 呼伦贝尔市| 德钦县| 建湖县| 峨边| 九龙坡区|